Project directory

download (2).jpg
        

        

arcflash.jpg
IMG_005196.jpg
bumc1.JPG
17973890_1382666815105596_9149009322879305888_o.jpg
1.jpg
download (4).jpg
download.jpg
Picture 011B.jpg
GettyImages-490931478 (1).jpg
 
download (2).jpg

Animal hospitals and veterinary

Aloha Animal Hospital, York, Pennsylvania

  • Over 3,000 sq. ft.
  • Mechanical, electrical, and plumbing design services for a veterinary office
  • Radiology and X-ray systems, an isolation ward, 3 primary exam rooms, treatment, surgery, and isolation areas

East York Veterinary Center, York, Pennsylvania

  • Mechanical, electrical, and plumbing design services for an addition and renovation to an existing veterinary facility totaling 6,100 sq. ft.
  • Diagnostic lab, digital X-ray system, an isolation ward, 4 primary exam rooms and a distribution center for Eastern Veterinary's blood bank, and boarding facilities
  • New fire alarm system

Yorkshire Animal Hospital, York, Pennsylvania

  • Mechanical and electrical engineering services for 8600sf renovations
  • Surgery area with HEPA filtration, treatment area, recovery rooms, exam rooms, etc.
  • Battery emergency lighting, fire alarm, phone/data outlet systems and power for receptacles 
 
arcflash.jpg

Arc Flash

Tyson Foods, Wilkesboro NC

  • Arc flash study and safety training for food processing and storage facility
  • Evaluation of power distribution equipment 
  • Easy Power software
  • Safety training
 
download.jpg

Cannabis cultivation

  • Heating, cooling, and dehumidification

  • Air circulation and filtration

  • Irrigation water supply

  • General lighting with grow lights and controls

  • Power distribution system evaluation and design

 
1 (3).jpg

Church projects

St Elizabeth Ann Seton Parish, Mechanicsburg, PA

  •  54,000 square feet
  • New narthex, chapel, office area, café, multipurpose hall, and a large commercial kitchen
  • Revision of classrooms into a meeting room, reconfiguring rooms for a nursery, and renovations to the entrance of the church

 

St. Joseph Catholic Church, Hanover, Pennsylvania

  • MEP design for a 9,500 square foot addition 
  • HVAC systems included single zone rooftop packaged and split systems, plumbing for new fixtures, fire protection systems, site lighting, evaluation of the existing electrical service, design of all power and lighting systems, fire alarm design, access control, intrusion detection, and voice/data systems

 

 
FARQUAHR PARK POOL (6).JPG

Community projects

YMCA Expansion, Hanover, Pennsylvania

  • Mechanical and electrical engineering services for additions and renovations to the YMCA in Hanover
  • New pool, exercise rooms, offices and bathrooms
  • Converted existing exercise rooms into day care areas and designed a new exercise room with new HVAC systems, lighting, and day lighting controls
  • Evaluation and design of an upgraded power service

YMCA, York, Pennsylvania

  • Constant volume reheat distribution system was converted to a variable volume reheat system. replace the existing hot water coils with variable volume control boxes, and hot water reheat coils connected to the existing hot water system
  • Power distribution for new mechanical equipment

York Revolution Stadium, York, Pennsylvania

  • 1000 sf of renovations
  • Added two offices to existing team store and modified storage room in existing office space
 
IMG_3609 (1).jpg

commercial Projects

Apple BMW, York, Pennsylvania

  • 14,000 square foot new facility
  • Show room, sales offices and preparation bays
  • Design included HVAC, Plumbing, Power and lighting

Stambaugh Ness, York, Penssylvania

  • MEP for a two story, 13,600 sf per floor
  • Utilizes rooftop units for the second floor, and variable refrigerant air handlers with an energy recovery unit for the first floor
  • Power, lighting, and fire alarm design

Freightliner, Hagerstown, Maryland 

  • New 61,900 square foot truck service and sales facility
  • Single zone HVAC systems in the office areas, gas fired radiant heaters, general ventilation fans, and vehicle exhaust in the service areas
  • New power service from and power for shop equipment
  • Interior/exterior lighting design
 

Energy Studies

Fredricksen Library, Camp Hill, Pennsylvania

  •  Energy audit and detailed calculations for 10yr old 30,000sf public library to compare to various options for HVAC upgrades
  • DPW grant applications and administration to verify the projected 35% energy savings
  • First year after construction, utility bills indicated energy consumption was 40% lower than the previous year

Morningstar Farms, York, PA

  • 55,000sf farmer’s market renovation and 1.0 MW solar photovoltaic project
  • Energy modeling using Energy Pro v5 software and life-cycle economic analyses were completed
  • HVAC upgrades such as geothermal heat pumps, variable refrigerant flow heat pumps (VRV), and replacement of existing split system furnaces were condidered

 

 
IMG_0357.JPG

healthcare Projects

Dermatology Associates of York, York, Pennsylvania

  • Renovations to the two-story, 3,000 sf building
  •  Gas furnace with zone dampers controlled by a programmable control system and electric unit heaters
  •  Lighting design for LED fixtures with emergency and exit lighting
  • Electrical power distribution upgraded

Family First Dental, Hanover, Pennsylvania  

  • 3,000 s.f. dental office fit-out including 5 exam rooms, lab, sterile room and procedure room
  • HVAC, plumbing, lighting, power, service, distribution and fire alarm
  • Fluorescent general lighting, battery emergency lighting, new power service and distribution for receptacles, x-ray, etc

 

 
Lobby photo with Stairs by Toby Richards.jpg

Hospitality/hotel projects

Burger King, Philadelphia, Pennsylvania  

  • New Burger King to be located within a 2,200 sf tenant space
  • Air unit with hot gas reheat dehumidification, a split system air handler, and an existing natural gas duct furnace

Lancaster Arts Hotel, Lancaster, Pennsylvania

  • Five story, 48,000 square foot hotel and 20,000 square foot two story parking garage
  • Fluorescent general illumination, night lighting, battery emergency and controls; design of voice/data system including outlets and wiring back to central location and a visual ADA fire alarm system 

Subway, Various Locations

  • 1,500 - 2,300 square foot restaurant fit-outs in shopping centers with connections to existing utilities
  • HVAC, plumbing and electrical design for all kitchen and dining spaces including connections to restaurant equipment

 

 
download (4).jpg

Senior care projects

Pleasant Acres, York, Pennsylvania

  • Complete renovation of a five-story 134,000sf nursing facility
  • Replacement of fire alarm systems, generator systems, heating water and internal plumbing
  •  Fire alarm system replacement included main building, connection corridor and tunnels, hospital building, laundry building, dietary building and plant operations building
  • Indoor emergency generator and automatic transfer switches were installed
  • Domestic water, sanitary and hot water systems were replaced.

Transitions Healthcare Gettysburg, Gettysburg, Pennsylvania

  •  4,000 square feet of the west wing in the Transitions Healthcare
  • Converted four single occupancy rooms to six long term care suites with individual showers to meet nursing care requirements
  • LED lighting w replaced the existing and new nurse’s call system was included
 
Picture 011B.jpg

Waste water treatment plants

Highspire WWTP Upgrade and Expansion

  • Retrofitting plant to an Oxidation Ditch treatment plant with a capacity of 2.5 MGD
  • Additions included: Primary Distribution Box, Automatic Bar Screen, Grit Chamber, Clarifier/Thickener, Influent Pump Station, RAS Pump Station, Oxidation Ditch and Control Building. Existing process component retrofit consisted of the conversion of the Mixed Liquor Screw Lift Pumps, Grit Chamber, Final Clarifier #3 and WAS Valve Box
  • 800 A-277/480V-3Ph-4W Electric Service, Main Distribution Panelboard, Diesel Stand-By Generator, Automatic Transfer Switch and Sub-Distribution Transformers and Panelboards
  • Lighting and power distribution design
  • New systems required for  Influent Pump Station, RAS Pump Station and Control Building
  • Heating and ventilation  in Pump Stations, and HVAC, sanitary and city water systems were provided
  • Areas in the Control Building consisted of Lab, Office, Toilets, Locker Room, Break Room, Utility Room and Conference Room

Pine Creek #1N Water Pumping Station

  • Electrical and HVAC design for a pole building to house a simplex, high pressure, water pumping station that pumps 347gpm of water from a nearby stream to an elevated reservoir
  • 1000 A-277/480V-3Ph-4W Electric Service Main Distribution Panelboard, Sub-Distribution Transformer and Panelboard, control component integration, variable frequency drive selection, description of operation for the pumping process control, data logger selection, interior and exterior lighting and power distribution
  •  Interconnection wiring between field mounted sensors and control panel
  • Data is collected and stored and can be downloaded locally or transmitted via cellular connection per the Owner’s request
  • New mechanical heating and HVAC systems